Simulasi Perbaikan Faktor Daya pada Gedung Rumah Sakit Islam Gigi dan Mulut Sultan Agung Semarang dengan Menggunakan ETAP
Submitted : 2024-07-14, Published : 2024-08-10.
Abstract
Keywords
Full Text:
PDFReferences
B. Bayu Dwi Chayo, “Analisis Perencanaan Perbaikan Faktor Daya Sebagai Upaya Optimasi Daya Listrik di Gedung Jurusan Teknik Elektro Universitas Malikussaleh,” Skripsi, Universitas Malikussaleh, 2024.
F. G. Popescu, D. Pasculescu, M. Marcu, T. Niculescu, A. D. Handra, “The technical and economic advantages of power factor correction,” Annals of the University of Petrosani, Electrical Engineering, vol. 21, hal. 35–42, 2019.
N. Titu, P. Dragoş, P. Leon, “Study of the operating states of intrinsic safety barriers of the electric equipment intended for use in atmospheres with explosion hazard,” WSEAS Transactions on Circuits and Systems, vol. 9, no. 6, hal. 430–439, 2010.
R. Rusda, K. Karim, M. Masing, “Analisis Perbaikan Faktor Daya Untuk Penghematan Energi Listrik Pada Politeknik Negeri Samarinda,” in Prosiding Seminar Nasional Teknologi, Inovasi dan Aplikasi di Lingkungan Tropis, vol. 1, no. 1, hal. 1–9, 2018.
R. Rusliadi, “Penggunaan Capacitor Bank Sebagai Perbaikan Faktor Daya pada Kelistrikan di Gedung Hotel Arista Palembang,” Skripsi, Universitas Tridinanti Palembang, 2022.
H. Ndikade, S. Salim, and S. Abdussamad, “Studi Perbaikan Faktor Daya Pada Jaringan Listrik Konsumen Di Kecamatan Katobu Kabupaten Muna,” Jambura Journal of Electrical and Electronics Engineering, vol. 4, no. 1, hal. 52–59, 2022. https://doi.org/10.37905/jjeee.v4i1.11989
I. Roza, “Analisis Penurunan Cos phi dengan Menentukan Kapasitas Kapasitior Bank Pada Pembangkit Tenaga Listrik Pabrik Kelapa Sawit (PKS),” Journal of Electrical and System Control Engineering, vol. 2, no. 1, 2018. https://doi.org/10.31289/jesce.v2i1.1917
M. Amir, A. M. Somantri, “Analisis Perbaikan Faktor Daya Untuk Memenuhi Penambahan Beban 300 kVA tanpa Penambahan Daya PLN,” Sinusoida: : Jurnal Penelitian dan Pengkajian Elektro, vol. 19, no. 1, 2017. https://doi.org/10.37277/s.v19i1.153
T. Nusa, S. R. U. A. Sompie, M. Rumbayan, “Sistem Monitoring Konsumsi Energi Listrik Secara Real Time Berbasis Mikrokontroler,” J. Tek. Elektro dan Komput., vol. 4, no. 5, hal. 19–26, 2015. https://doi.org/10.35793/jtek.v4i5.9974
D. A. Basudewa, W. Aribowo, M. Widyartono, A. C. Hermawan, “Analisa Penggunaan Capacitor bank terhadap Faktor Daya Pada Gedung IDB Laboratory UNESA,” Jurnal Teknik Elektro, vol. 9, no. 3, hal. 697–707, 2020. https://doi.org/10.26740/jte.v9n3.p697-707
A. Chandra, T. Agarwal, “Capacitor Bank Designing for Power Factor Improvement,” International Journal of Emerging Technology and Advanced Engineering, vol. 4, no. 8, hal. 235–239, 2014.
H. S. Syafruddin, J. Napitupulu, J. Sinaga, and B. Sitorus, “Studi Kompensasi Daya Reaktif terhadap Kenaikan Faktor Daya,” Jurnal Teknologi Energi UDA: Jurnal Teknik Elektro, vol. 11, no. 1, hal. 11–20, 2022.
I. Hajar, K. Ramadhanti, “Kajian Perbaikan Tegangan Menggunakan Capacitor bank Di PT. Panca Agung Sejati,” Jurnal Ilmiah Sutet, vol. 12, no. 1, hal. 12–20, 2022. https://doi.org/10.33322/sutet.v12i1.1662
Article Metrics
Abstract view: 117 timesDownload  : 72 times
This work is licensed under a Creative Commons Attribution 4.0 International License.
Refbacks
- There are currently no refbacks.