STUDI KELAYAKAN PEMBANGUNAN INSTALASI JARINGAN PIPA AIR DENGAN METODE COST & BENEFIT ANALYSIS GUNA MEMINIMALKAN WAKTU MATERIAL HANDLING

Esa Rengganis

Submitted : 2017-08-31, Published : .

Abstract

Production facility have a significant influence on production process. CV. Jokudo Kamsa got a problem on water filling on rotary drum, it takes 120 minutes on tanning process. It causes the facility is not enough for this process. So, we need to build pipe installation to reduce material handling time, especially on water filling’s time. Feasibility study on pipe installation based on Benefit Cost Analysis Methode. We applied NPV, Payback Period and Return On Investment. Based on data tabulation we found Rp. 84,787,387,75 on NPV, 74,87 percent on ROI and 5.23 months on PP. And the most important thing we can reduce material handling time in 70 minutes on water filling with material handling cost as big as Rp. 139,804,9.

Keywords

material handling time, benefit cost analysis

References

Apple, James M, 1990, Tata Letak Pabrik dan Pemindahan Bahan, Edisi Ketiga, Institut Teknologi Bandung, Bandung.

Chang, Yih-Long, 2003, WinQSB Decision Support Software for MS/OM. John Wiley & Sons, Inc.

Group Technology Dan Algoritma Blocplan Untuk Meminimasi Ongkos Material Handling”, Jurnal Teknologi, Volume 3 Nomor 1 , 1ST AKPRIND, Yogyakarta.

Hadiguna, Rika Ampuh dan Setiawan, Heri, 2008, Tata Letak Pabrik, Andi Yogyakarta, Yogyakarta.

Heragu, S., 1997, Fasilities Design. PWS Publishing. Boston.

Kasmir dan Jakfar, 2003, Studi Kelayakan Bisnis, Penerbit Kencana, Jakarta.

Nurmianto, Eko, 2004, Ergonomi Konsep Dasar dan Aplikasinya, Guna Widya, Surabaya.

Pujawan, Nyoman, 2009, Ekonomi Teknik, Guna Widya, Surabaya.

Suliyanto, 2011, Studi Kelayakan Bisnis, Andi Publisher, Jakarta.

Susanto, Dwi, Tony, dkk, 2013, Studi Kelayakan Investasi Perluasan Jaringan TV Kabel pada PT. XYZ Dengan Metode Cost & Benefit Analysis, Semnas Sistem Informasi Indonesia SESINDO.

Susetyo, Joko, Simanjuntak, Adelina, Risma, Ramos, Magno, Joao, 2010, Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Pendekatan.

Sutalaksana, Iftikar Z, dkk, 2006, Teknik Perancangan Sistem Kerja, ITB, Bandung.

Wahyudi, Eko, Sri, 2010, Perancangan Ulang Tata Letak Fasilitas Produksi di CV. Dimas Rotan Gatak Sukoharjo.

Wignjosoebroto, Sritomo, 2003, Tata Letak Pabrik dan Pemindahan Bahan, Edisi Ketiga, ITS, Surabaya.

Yulaisia, Rikal, 2010, Perancangan Ulang Tata Letak Pabrik Pada UD KURNIA Di Kota Dumai (Studi Kasus: UD KURNIA), Dumai.

Article Metrics

Abstract view: 920 times
Download     : 856   times

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Refbacks

  • There are currently no refbacks.